Customization: | Available |
---|---|
After-sales Service: | on Line Available |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
> | Hydraulic overload protection device | > | Two-degree fall protection device |
> | Maintenance tools and tool box | > | Air blowing device |
> | Electric slider adjusting device | > | Mechanical shockproof feet |
> | Variable frequency variable speed motor (adjustable speed) | > | Reserved interface for wrong delivery detection device |
> | Mechanical quakeproof foot | > | Maintenance tools and toolbox |
> | Digital mold height indicator | > | Main motor reversing device |
> | Slider and mold balance device | > | Photoelectric safety protection device |
> | Rotating cam controller | > | Power outlet |
> | Crankshaft angle indicator | > | Electric thin oil lubrication device |
> | Electromagnetic counter | > | Touch screen (pre-break, pre-load) |
> | Air source connector | > | Wet clutch |
> | Pneumatic mold pad device | > | Leveling machine |
> | Security door | > | Manipulator |
> | Quick die change device (Die lifter, die clamper or die mover) |
> | Rack |
> | Mobile two handed console | > | Electric grease lubrication device |
> | Upper part hit material device of slider | > | Foot switch |
> | Feeder (air, mechanical and NC) | > | Mobile die trolley |
> Training:
Qiaosen provide complete training for our aboard customers through Internet so that operators, supervisors and maintenance team could know well of operation and maintenance as well as simply trouble shootings.
> Maintenance:
Qiaosen in-house maintenance department are responsible for internet inspection and suggestion immediately. If the remote guidance couldn't solve the issue, we will arrange the professional engineers to the door for maintenance by paid service.
Q: | Are you a factory or trading company? |
A: | We are an integrated company of industry and trade. |
Q: | What are your main products? |
A: | We specialize in manufacturing power press machine, decoiler straightener and feeder, metal stamping die, transfer arms etc. (we could help customers contract to build the whole stamping line projects.) |
Q: | What's the delivery time? |
A: | The standard machine is 25 to 30 days after payment. If asked to supply whole production line by our customer, we will confirm the delivery time based on the specific project itself. |
Q: | What's your payment term? |
A: | we advise 30% T/T deposit, balance paid before shipment. |
Q: | Do you receive OEM? |
A: | Yes, we warmly welcome customers to do OEM in our factory. |